by Chris Anjel | Aug 26, 2026 | Uncategorized
Most shops have a good handle on machine time. They know their hourly rates, their cycle times, and how to amortize equipment costs across a build. What trips them up is everything that happens after the part comes off the machine.Support removal, heat treatment,...
by Chris Anjel | Aug 26, 2026 | Uncategorized
Every shop gets the call: a customer needs a replacement part for equipment built twenty years ago. The original drawings are lost, the OEM is gone, and all they have is a worn-out sample sitting on a pallet. For digital manufacturers, these legacy part requests are...
by Chris Anjel | Aug 26, 2026 | Uncategorized
Engineering change orders (ECOs) are a fact of life in digital manufacturing. A customer revises a critical dimension, swaps a material, or adds a feature after you’ve already quoted, scheduled, or even started production. The request lands in your inbox with an...
by Chris Anjel | Aug 26, 2026 | Uncategorized
Most shops know their machine hourly rate. Fewer know exactly how much setup time each job really consumes. That gap is where margin disappears — especially on low-volume and prototype work where setup can exceed run time.Why Setup Time Gets UnderestimatedEstimators...
by Chris Anjel | Aug 26, 2026 | Uncategorized
Most shops know to quote setup, run time, and material. Few consistently quote the time spent calibrating machines before a job runs. Whether it’s a CNC probe routine, a 3D printer bed level, or a laser power check, calibration consumes operator attention and...