by Chris Anjel | Aug 26, 2026 | Uncategorized
Engineering change orders (ECOs) are a fact of life in digital manufacturing. A customer revises a critical dimension, swaps a material, or adds a feature after you’ve already quoted, scheduled, or even started production. The request lands in your inbox with an...
by Chris Anjel | Aug 26, 2026 | Uncategorized
Most shops know their machine hourly rate. Fewer know exactly how much setup time each job really consumes. That gap is where margin disappears — especially on low-volume and prototype work where setup can exceed run time.Why Setup Time Gets UnderestimatedEstimators...
by Chris Anjel | Aug 26, 2026 | Uncategorized
Most shops know to quote setup, run time, and material. Few consistently quote the time spent calibrating machines before a job runs. Whether it’s a CNC probe routine, a 3D printer bed level, or a laser power check, calibration consumes operator attention and...
by Chris Anjel | Aug 26, 2026 | Uncategorized
Most 3D printing quotes assume planar slicing — flat layers stacked on the Z axis. But non-planar printing, whether on a 5-axis machine or through curved-layer slicing on 3-axis hardware, changes the geometry of the job and the economics of the quote. If you’re...
by Chris Anjel | Aug 26, 2026 | Uncategorized
Heat treatment and finishing are where quotes quietly lose money. They’re often treated as afterthoughts — a single line item with a flat markup — but they carry distinct cost drivers: furnace time, fixturing, masking, racking, inspection, and shipping. If...